Overhead Crane

coil loading overhead crane

Contact Info

Name:Wendy
Company:WEIHUA Group
Tel: +86-15838256284
Email: [email protected]
WhatsApp: +86-15838256284
Fax: +86-371-55680119
Address: West Weihua Road, Changyuan, Henan Province,China

Summary

Demag Cranes & Components Corp. 29201 Aurora Road Solon Ohio 44129 1-800-756-8221 www.demag-us.com Coil Grabs | Coil Lifter | Coil Grabber The Model M5067 motorized coil grab is one of Bushman’s signature products and is used by hundreds of metal […]

coil loading overhead crane

Demag Cranes & Components Corp. 29201 Aurora Road Solon Ohio 44129 1-800-756-8221 www.demag-us.com

Coil Grabs | Coil Lifter | Coil Grabber

The Model M5067 motorized coil grab is one of Bushman’s signature products and is used by hundreds of metal service centers and mills. Combining operating efficiency, protection of the coil, and utilization of the overhead crane system, the M5067 motorized coil grab offers the most comprehensive coil handling features.

Coil lifter is designed to easily lift and position narrow coils, placing the lifting arm securely through the I.D. of the coil. Lifter guide handle and radius on the lifting arm to minimize coil damage is standard. Engineered and manufactured to ASME B30.20 & BTH-1 Design Category B Service Class 2.

Our industrial overhead cranes represent high-level Konecranes quality starting from a single component all the way to an entire process. Chain hoist cranes With its robust design, smooth controls, and lifting capacity of up to 5 tons, the chain hoist crane is a strong link in your manufacturing process.

Easy horizontal to vertical upending of coils. Pivoting wedge for easy tilting of stacked coils. Wedge acts as retainer. Efficient and easy to use. Popular for use with small, lightweight coils. For use where overhead clearance is limited. Specially designed heat treated pivoting wedge. Complies with ASME standards.

A good coil upender will simplify the dangerous process of tilting the coil manually or with overhead cranes. Our upender line up and down ender line up can help you safely position any large loads and are utilized for a number of applications from tilting paper rolls, plastic film, rotating press molds and dies, or any heavy awkward loads.

Industrial Lifters — Caldwell Group Lifting Solutions

Steel, aluminum or other material – our complete line of coil handling equipment will have the lifter you need for a safe lift. Load Rotation Lifters that offer a safe and effective solution for rotating your load in a wide range of applications.

Overhead crane load testing. For the safety of your workers and facility, overhead crane load testing is required by OSHA law to make sure lifting crane equipment working in proper order before coming into use.

Safety Tips for Overhead Crane Operation. 1) Before use, ensure the crane is suitable for the planned hoisting task. Confirm it has appropriate travel, lift, and capacity. 2) Visually and physically inspect the crane before use. Check for damage, wear, and proper operation of all functions. 3) Confirm the load weight.

Bar, Plate, and Coil Handling Equipment The team at American Crane & Equipment Corp. builds high-performance material handling solutions to meet the demands of some of the harshest industries on Earth — clean rooms, shipping facilities, wastewater treatment facilities, and aerospace operations, just to name a few.

A good coil upender will simplify the dangerous process of tilting the coil manually or with overhead cranes. Our upender line up and down ender line up can help you safely position any large loads and are utilized for a number of applications from tilting paper rolls, plastic film, rotating press molds and dies, or any heavy awkward loads.

Overhead Cranes | Konecranes

Our industrial overhead cranes represent high-level Konecranes quality starting from a single component all the way to an entire process. Chain hoist cranes With its robust design, smooth controls, and lifting capacity of up to 5 tons, the chain hoist crane is a strong link in your manufacturing process.

Easy horizontal to vertical upending of coils. Pivoting wedge for easy tilting of stacked coils. Wedge acts as retainer. Efficient and easy to use. Popular for use with small, lightweight coils. For use where overhead clearance is limited. Specially designed heat treated pivoting wedge. Complies with ASME standards.

Overhead crane load testing. For the safety of your workers and facility, overhead crane load testing is required by OSHA law to make sure lifting crane equipment working in proper order before coming into use.

Overhead crane load testing procedures. As for the load testing of overhead cranes, it should be bear in mind that the test loads shall not be more than the 125 % of the rated lifting capacity. And also all the load testing reports should be filed which can be accessed by the personnel who is in charge.

Our below-the-hook equipment consists of C-hooks, coil grabs, coil lifters, vertical lifting equipment, lifting device for cranes, crane attachments, spreader beams, hook blocks, ladle hooks, load weighing, sheet lifters, plate lifters, bundle lifters, crane lifting attachments, pallet lifters, lifting tongs, roll handling equipment, drum

Overhead Crane Safety and Prevention – Washington

Overhead Crane Safety and Prevention Crane Operators Hoist Operator The employee that uses the hoist to lift, lower, and move a load by means of an overhead crane. Rigger The employee that is responsible for balancing and securing the load to the hook, and will direct the hoist operator during the lift.

The correct procedure for loading coils onto the uncoiler is using the crane and sling to lift the coil in place with an expander through the center of the coil. The expander and another locking mechanism hold the coil in place. Once the coil is locked in place the sling is removed by releasing tension on the crane. This allows for one loop of

Now that we understand how an overhead crane’s holding brakes and control brakes combine to provide safe load handling, the process for checking control brakes is simple. After checking to ensure that the holding brakes are functioning properly, hoist the load a little higher, maybe a foot or so more.