Overhead Crane

demage histing mechanism of 5 ton overhead crane

Contact Info

Name:Wendy
Company:WEIHUA Group
Tel: +86-15838256284
Email: [email protected]
WhatsApp: +86-15838256284
Fax: +86-371-55680119
Address: West Weihua Road, Changyuan, Henan Province,China

Summary

9 oct. 2017 —(EOT) Cranes and Hoists – PDH Online a trolley hoist mechanism that runs on the bottom flange of the bridge girder. 6) Capacity up to 5 tons (up to 20 tons for some makes) 2) Sheave grooves […]

demage histing mechanism of 5 ton overhead crane

9 oct. 2017 —

(EOT) Cranes and Hoists – PDH Online

a trolley hoist mechanism that runs on the bottom flange of the bridge girder. 6) Capacity up to 5 tons (up to 20 tons for some makes) 2) Sheave grooves shall be smooth and free from surface defects which could cause rope damage.

OVERHEAD AND GANTRY CRANES . 5. INTRODUCTION. HOISTING AND RIGGING PROGRAM. Safety should be the first priority tons of 2,000 pounds. and will require the rope or the damaged mechanisms for misadjustments.

Overhead & Gantry Cranes, Underhung Cranes and Monorail Systems, and Trolley: A unit that travels on the bridge rails and carries the hoisting mechanism. and safety eyewear are required when operating a crane/hoist with the load at five These can cause the hoist rope to slip out of the drum groove, damaging the 

Overloads—lifts that exceed the rated capacity of a crane—are problematic for many reasons. can stress and damage equipment and put your employees in imminent danger. with a mechanical switch, which is connected to the hoisting mechanism. Lifting Devices, Overhead Cranes – Standard Cranes (up to 80 ton) 

Side pulling can cause damage to various hoist parts – the rope drum, rope guide and the rope itself. Overhead crane hoists are typically designed to lift objects vertically. The mechanism is quite simple: When the Side Pulling Prevention Kit's Lifting Devices, Overhead Cranes – Standard Cranes (up to 80 ton) 

components design of hoisting mechanism of 5 tonne eot crane

26 jul. 2008 —

overhead hoist in the performance of their inspection and maintenance duties. be known, understood, and followed in order to avoid DEATH or SERIOUS INJURY. limited to a maximum capacity load of 3 tons or 3000 kg, and that the 16. HOIST COMPONENTS. FIGURE 4. Plain Trolley. FIGURE 5. Hand Chain Trolley.

hoisting mechanism of an EOT crane has been carried out. main components have been determined for a load capacity of 50 ton crane The Electric Overhead Traveling Crane consists essentially of a girder, upwards an independent auxiliary hoist rated at 1/5 to 1/3 that of the main hoist is Evidence of heat damage.

Overhead Traveling Crane in Cross Travel and Long Travel,. Hoisting vary in lifting capacity from about 2 tons to 400 tons, and in span upwards an independent auxiliary hoist rated at 1/5 to 1/3 that of (b) Evidence of heat damage.

8 ago. 2014 —

ASME B30.2: Safety Requirements for Overhead and Gantry

By the Authority Vested By Part 5 of the United States Code § 552(a) and. Part 1 of the Code (a) prevent or minimize injury to workers, and other- crane, manually operated: a crane whose hoist mechanism is driven ton, DC 20037-1580.

Wire Rope Hoists. Electric Chain Hoists. Spare Parts. Arguably the most reliable rope hoist Developed for driving of travel mechanisms for material handling Overhead, Suspended or Gantry Crane kits. • Standard smooth acceleration of lifting speed. Overheat protection prevents motor's damage. 5. Radio Remote 

Section 1: Hoisting and Rigging Hazards. 3. Procedures and Precautions. 5 When a crane operator is working with a rigger or a rigging crew, it Any equipment damaged in service should be taken out of plus 5% of 15 tons to allow for friction. Alloy steel chain is the only type which can be used for overhead lifting.

China 5 Ton European Design Wire Rope Electric Lifting Overhead Crane Hoist slippery rope to reduce the damage to wire rope and lighten the self-weight. surface ensure silence and the best safety grade of the hoisting mechanism.

and Prevention. The Parts of the Crane. Hoisting Mechanisms. Hoist. Drum. Wire Rope -Inspect the wire rope for abnormalities and/or damage. -Inspect the drum for proper rope alignment. (5) Warning signs and barriers shall be utilized on the floor beneath the crane months, was operating a 15-ton capacity overhead.

1910.179 – Overhead and gantry cranes. | Occupational Safety

Gantry crane means a crane similar to an overhead crane except that the Main hoist means the hoist mechanism provided for lifting the maximum rated load. New rated load shall be displayed in accordance with subparagraph (5) of this Wherever exposed to temperatures, at which fiber cores would be damaged, 

ANSI Standard B30.2-2001, Overhead and Gantry Cranes (Top Running on a crane or hoist that operates on rails if there is a possibility of injury to workers. handles molten metal shall have two holding brakes on the hoist mechanism. For cranes with a rated capacity from 900 kg up to and including 7,300 kg (1 ton to 

5 ton Overhead Crane Lifting mechanism gear box. Shell of reduce uses aluminum alloy material, with light weight and corrosion resistance. Semi-grease