Summary

Sep 24, 2019 · Wedge Sockets. Wedge sockets secure the rope to the end attachment by passing it around a grooved, wedge-shaped piece of steel and pulling it down under load into the bowl of the fixture. Wedge sockets are popular because […]

is wedge socket on an overhead crane compulsory

Sep 24, 2019 · Wedge Sockets. Wedge sockets secure the rope to the end attachment by passing it around a grooved, wedge-shaped piece of steel and pulling it down under load into the bowl of the fixture. Wedge sockets are popular because they can be installed in field and adjusted in field – providing 80% efficiency of rope breaking strength.

13 Rigging Best Practices for Your Next Overhead Lift

Oct 25, 2018 · Compression Hardware (wire rope clips, wedge sockets) Links, Rings, and Swivels; Rigging Blocks; 3. Inspect Your Lifting Slings. In the lifting and rigging industries, ASME B30.9 is one of the most commonly-referenced standards that applies to the fabrication, attachment, use, inspection, testing, and maintenance of slings used for load

Cable wedge sockets are used to attach a steel cable to a fixed point. They are most often used on cranes. When the rope needs frequent changing due to wear, or when frequent rope length adjustment is a requirement of the task, a cable wedge socket is the best tool for the job. To use a wedge socket, the wire rope is threaded into the tapered opening of the cable wedge socket and then coiled around the …

Aug 14, 2007 · The wire rope running on most cranes terminates in an asymmetric wedge socket. This cone-shaped device wraps a loop of wire rope around a wedge that slots inside it. Wedge sockets are perfect for cranes because they are self-tightening, says wire rope designer Roland Verreet, of Germany-based Wire Rope Technology.

A wedged socket is fitted to a wire rope. The nominal diameter of the wire rope shall be equal to the nominal size of the wedge-type socket and the loaded end of the rope shall enter the socket body so that when loaded it will not bend where it leaves the socket body. Suitable for rope termination such as crane rope applications.

May 30, 2018 · -4. Approved Wedge Socket Attachment Methods 8 6-5. Approved Cable Thimble Attachment Method 8 6-1. Common Hooks 8A 1 H1 -2. Hook Terminology 8A 2-1. One Part Line Configuration 9 2-2. Two Part Line Configuration 9 2 I 3. Three Part Line Configuration 9 2 I -4. Articulating Crane Capacity Placard Description 9 3 I -5.

Installation of Wedge Sockets – Unirope Ltd. – Crane Rope

Installation of Wedge Sockets End terminations with wedge sockets are most popular with tower and mobile cranes although they do not generate as high as an strength efficiency rating as swaged sleeves, swaged sockets, or spelter sockets. Depending on rope construction and type, their efficiency rating ranges between 75% and 80%.

TM5-3810-305-10 Installing Wedge Socket on Cable CAUTION Be certain correct socket and wedge as supplied are used. Failure to follow this procedure could cause damage to equip-ment. When installing wedge-type sockets on cable, use the following procedure: 1. Lead cable through socket and forma large loop. Draw cable end back through socket approximately 2 in. (50.8 mm) (Figure 2-2).

Crane Sockets. McKissick® S-421T “TERMINATOR® ” Wedge Sockets McKissick® S-421T “TERMINATOR® ” Wedge Sockets > McKissick® S-423T “SUPER TERMINATOR®” Wedge Sockets McKissick® S-423T “SUPER TERMINATOR®” Wedge Sockets > McKissick® SB-427 Button Spelter Sockets McKissick® SB-427 Button Spelter Sockets >

Prosedur Pemeriksaan dan Pengujian Overhead Crane Pemeriksaan dan pengujian pesawat angkat (crane) dilakukan oleh inspektur pesawat angkat (crane inspector) yang berkualifikasi bersama dengan inspektur Ditjen yang terkait ( misal Migas ) untuk menyakinkan bahwa crane dapat dioperasikan dengan baik dan aman. pada saat uji beban.

Shop Rigging Hardware The S-421T Wire Rope Wedge Socket meets the performance requirements of Federal Specification RR-S-550D, Type C, except those provisions required of the contractor. Wedge socket terminations have an efficiency rating of 80% based on the catalog strength of XXIP wire rope. Crosby products meet or exceed all requirements of ASME B30.26 including Read More »

LIFTING AND HOISTING – Shell Contractor

NOTE: This definition applies only to articulating boom cranes rated 5 tons or less. Any articulating boom crane rated greater than 5 tons is considered a mobile crane in this Standard. 2.6 Overhead Cranes Includes overhead cranes (see figures below), powered or manually operated, that have a hoist that can move with a load attached, such as:

Crane Preventive Maintenance Checklist (page 2 of 3) Comments: Note: The items below should be inspected during a typical preventive maintenance check. Additional checklist items may be required depending on equipment or circumstances. Load Chart: ‚ wedge socket / end fitting

dynamcmetrical open wedge socket 50008 (parts of overhead crane ) dtls as per inv. france: kolkata air cargo: pcs: 8: 1,021,216: 127,652: may 19 2016: 84314990: hoist rope socket wedge part no. x57/2 (spare parts for rb crane model 61rb s/no. 35585) ws-6 complete 3/4 wedge socket (crane parts) united states: nhava sheva sea: nos: 5: 97,036

The latest removal criteria for slings (wire rope, synthetic web, roundslings and alloy chain), below-the-hook lifting devices, hoist system (Mobile Crane & Overhead Crane), shackles, rigging blocks, eyebolts and wedge sockets, as referenced in the 29 CFR 1910.184 and the following ASME Standards; B30.2, B30.5, B30.9, B30.10, B30.20 and B30.26.

Offshore Cranes (17) Overhead Cranes (1) Pallet Fork Loader Cranes (124) Pedestal Cranes (8) Pick & Carry Cranes (198) Ringer Cranes (6) Roofing Conveyors (10) Rough Terrain Cranes (1156) Service Mechanic Truck Cranes (385) Sign Cranes (9) Teletruck (1) Tower Cranes (2962) Trailer Mounted Cranes (11) Trolley Booms (32) Truck Cranes (1055) Wheel

2014 CRW – Best Practices for Wire Rope Installation

Oct 01, 2014 · Wedge Sockets 23. Wedge Sockets Does this look right ? 24. Wedge Sockets Does this look right ? 25. Wedge Sockets Does this look right ? 26. Does this look right ? Wedge Sockets 27. Standard to follow: EN 13411 "Torpedo” and other Crane style Buttons 28. We recommend to have all buttons proof tested to 40% of rope’s breaking strength.

Horizon Cable Service stocks many styles of overhaul balls for your crane and wire rope needs from all the top manufacturers including Crosby, McKissick, and Johnson. With varying weights and wire rope sizes, Horizon Cable has all of your rigging and crane needs covered.. Top Swivel Overhaul Balls can be purchased with eye hooks or self-locking hooks. . These downhaul balls having a working

Hoosier Crane Service Company is your source for new bridge cranes, overhead crane kits, electric chain hoists, wire rope hoists, parts and accessories. When you need your next crane, hoist or jib crane contact Hoosier Crane Service Co.

Crosby Button Spelter Sockets. Crosby Button spelter sockets are designed for use with mobile cranes, used to terminate high performance, rotation resistant ropes, and standard 6 strand ropes, with rope sizes from 1/2" to 1-1/2". Both the Sockets and buttons are re-usable.

Each ball can be equipped with the new US-422T Wedge Socket which can be easily adjusted to fit various sizes of wire rope by changing the wedge (Ensure that correct wedge is used for selected wire rope size). *Utilizes "N" style hooks with integrated latch. Replacement latch kit is S-4320. PL latch and S-4055 latch will not fit.

CRANES & LIFTING | Crane Safety Products

we supply complete load monitoring solutions for all overhead gantry cranes. There are various ways of achieving this to suit all budgets. The simplest solution is to fit a load pin in the compensation sheave, wedge socket or clamp on rope. A large digit display (4” or 8”) is fitted to the Trolley frame. Simply connect the pin and calibrate.

Wedge Air Nozzles Shaped to fit into extremely tight spaces, these nozzles can be used to remove parts from molds. Tap the wedge into position, attach the nozzle to …

Browse CM Forged CM Piggy-Back Wedge Socket Clips in the American Crane & Equipment Corp. catalog including Product Code,Item Name,Torque,Minimum Tall Length,Size,Condition By Keyword By Part Number 877-877-6778 Contact Part# User Login We’re Hiring!