Overhead Crane

overhead crane specifications pdf

Contact Info

Name:Wendy
Company:WEIHUA Group
Tel: +86-15838256284
Email: [email protected]
WhatsApp: +86-15838256284
Fax: +86-371-55680119
Address: West Weihua Road, Changyuan, Henan Province,China

Summary

Annotated OSHA Overhead Crane Specifications Page 1 of 13 Complements of Dearborn Crane & Engineering Co. OSHA Regulations (Standards – 29 CFR) Overhead and gantry cranes. – 1910.179 Regulations (Standards – 29 CFR) – Table of Contents • Part Number: […]

overhead crane specifications pdf

Annotated OSHA Overhead Crane Specifications Page 1 of 13 Complements of Dearborn Crane & Engineering Co. OSHA Regulations (Standards – 29 CFR) Overhead and gantry cranes. – 1910.179 Regulations (Standards – 29 CFR) – Table of Contents • Part Number: 1910 • Part Title: Occupational Safety and Health Standards • Subpart: N

Overhead cranes – Abus Kransysteme

ling crane is designed for spans up to 12m and load capacities up to 5 tonnes. The ABUS single girder semi­ goliath crane is designed for spans up to 15m and Safe Working Loads up to 10 tonnes. ABUS cranes make light work of lifting. ABUS is one of Europe’s leading crane manufacturers, offering customers tailor-made solutions for

MULTIPLE GIRDER ELECTRIC OVERHEAD TRAVELING CRANES. INTRODUCTION. This Specification has been developed by the Crane Manufacturers Association of America, Inc. (CMAA), an organization of leading electric overhead traveling crane manufacturers in the United States, for the purpose of promoting

One pair required per crane – Specify voltage and desired speed. * Reference Speed/Capacity/HP selection chart for correct drive hp and ratio. For speeds over 100 fpm do not use single speed control. If using 2 speed control for speeds over 100 fpm include a soft start with the control. Drive Horsepower Requirements for US (short) Ton Cranes*

crane. For double girder cranes an optional full-length service platform along the crane bridge can be supplied, where it is equipped with protective hand railing and toe strips according to applicable laws and standards. This allows safe access to the hoist and trolley, crane travelling machinery and electric panels for ease of maintenance. 6.

crane. The unnecessary high service classification will cause you to pay more money for the crane. 3. The Iifting speed of the crane important factors that increase the price. Definitely calculate how much speed you need. Especially in the standard workshop crane, high Iifting speed (6 m/min and more) will cause you to pay more money for the

SPECIFICATION FOR DOUBLE GIRDER 10 TON ELECTRIC OVERHEAD

SPECIFICATION FOR DOUBLE GIRDER 10 TON ELECTRIC OVERHEAD TRAVELLING (EOT) CRANE FOR ACDFS BUILDING 1. INTRODUCTION This crane will be installed in the newly constructed ACDFS building of Raja Ramanna Centre for Advanced Technology, Indore (MP). This Centre is situated at a distance of 14 km from Indore Railway Station.

New and existing equipment. All new overhead and gantry cranes constructed and installed on or after August 31, 1971, shall meet the design specifications of the American National Standard Safety Code for Overhead and Gantry Cranes, ANSI B30.2.0-1967. Modifications. Cranes may be modified and rerated provided such modifications and the supporting

4 CRANES CATALOG tel: 800.733.2231 [email protected] aceindustries.com aceindustries.com [email protected] tel: 800.733.2231 CRANES CATALOG 5 ABoUt Us Ace Industries, Inc., founded in 1932, is one of the largest overhead crane and hoist

ling crane is designed for spans up to 12m and load capacities up to 5 tonnes. The ABUS single girder semi­ goliath crane is designed for spans up to 15m and Safe Working Loads up to 10 tonnes. ABUS cranes make light work of lifting. ABUS is one of Europe’s leading crane manufacturers, offering customers tailor-made solutions for

Annotated OSHA Overhead Crane Specifications Page 1 of 13 Complements of Dearborn Crane & Engineering Co. OSHA Regulations (Standards – 29 CFR) Overhead and gantry cranes. – 1910.179 Regulations (Standards – 29 CFR) – Table of Contents • Part Number: 1910 • Part Title: Occupational Safety and Health Standards • Subpart: N

CMAA SPECIFICATION NO. 70-2020 – MHI

MULTIPLE GIRDER ELECTRIC OVERHEAD TRAVELING CRANES. INTRODUCTION. This Specification has been developed by the Crane Manufacturers Association of America, Inc. (CMAA), an organization of leading electric overhead traveling crane manufacturers in the United States, for the purpose of promoting

One pair required per crane – Specify voltage and desired speed. * Reference Speed/Capacity/HP selection chart for correct drive hp and ratio. For speeds over 100 fpm do not use single speed control. If using 2 speed control for speeds over 100 fpm include a soft start with the control. Drive Horsepower Requirements for US (short) Ton Cranes*

crane. For double girder cranes an optional full-length service platform along the crane bridge can be supplied, where it is equipped with protective hand railing and toe strips according to applicable laws and standards. This allows safe access to the hoist and trolley, crane travelling machinery and electric panels for ease of maintenance. 6.

crane. The unnecessary high service classification will cause you to pay more money for the crane. 3. The Iifting speed of the crane important factors that increase the price. Definitely calculate how much speed you need. Especially in the standard workshop crane, high Iifting speed (6 m/min and more) will cause you to pay more money for the

SPECIFICATION FOR DOUBLE GIRDER 10 TON ELECTRIC OVERHEAD TRAVELLING (EOT) CRANE FOR ACDFS BUILDING 1. INTRODUCTION This crane will be installed in the newly constructed ACDFS building of Raja Ramanna Centre for Advanced Technology, Indore (MP). This Centre is situated at a distance of 14 km from Indore Railway Station.

Overhead and Gantry Crane Program and Standard Operating

New and existing equipment. All new overhead and gantry cranes constructed and installed on or after August 31, 1971, shall meet the design specifications of the American National Standard Safety Code for Overhead and Gantry Cranes, ANSI B30.2.0-1967. Modifications. Cranes may be modified and rerated provided such modifications and the supporting

All inquiries concerning these Specifications should be directed in writing to the of the CMAA Engineering Vice President Committee, c/o Crane Manufacturers Association of America, Inc., 8720 Red Oak Blvd., Suite 201, Charlotte, NC 28217.

refer to CMAA Specification No. 78‐2002, Standards and Guidelines for Professional Services Performed on Overhead and Traveling Cranes and Associated Hoisting Equipment. 2.3 Recommended Inspection Team The inspector should have an assistant present at all times. Assisting the inspector is ideal for