Overhead Crane

standard load for overhead travelling crane

Contact Info

Name:Wendy
Company:WEIHUA Group
Tel: +86-15838256284
Email: [email protected]
WhatsApp: +86-15838256284
Fax: +86-371-55680119
Address: West Weihua Road, Changyuan, Henan Province,China

Summary

May 07, 2019 · The primary OSHA standard regulation detailing overhead crane operation and safe suspended load operation falls under the general industry standard 1910 in Title 29 of the Code of Federal Regulations, “Occupational Safety and Health Standards,” Subpart N, “Materials […]

standard load for overhead travelling crane

May 07, 2019 · The primary OSHA standard regulation detailing overhead crane operation and safe suspended load operation falls under the general industry standard 1910 in Title 29 of the Code of Federal Regulations, “Occupational Safety and Health Standards,” Subpart N, “Materials Handling and Storage,” specifically section 29 CFR 1910.179

1910.179 – Overhead and gantry cranes. | Occupational

Minimum clearance of 3 inches overhead and 2 inches laterally shall be provided and maintained between crane and obstructions in conformity with Crane Manufacturers Association of America, Inc., Specification No. 61, which is incorporated by reference as specified in §1910.6 (formerly the Electric Overhead Crane Institute, Inc).

L2= Cranes which rarely hoist the rated load, and normally hoist loads about 1/3 the rated capacity L3= Cranes which hoist the rated load fairly frequently, and norm ally hoist loads between 1/2 and 2/3 or the rated capacity L4= Cranes which are regularly loaded close …

provide the basic knowledge in the safe operation of overhead travelling cranes, gantry cranes, jib cranes and hoists. 1.2 Application This guide is intended to be used by crane operators and supervisors to promote safe lifting operations in the handling of Overhead Travelling Cranes, Gantry Cranes, Jib Cranes …

L2= Cranes which rarely hoist the rated load, and normally hoist loads about 1/3 the rated capacity L3= Cranes which hoist the rated load fairly frequently, and norm ally hoist loads between 1/2 and 2/3 or the rated capacity L4= Cranes which are regularly loaded close …

Single-girder overhead travelling cranes (EPKE/EKKE) Double-girder overhead travelling cranes (ZKKE) Max. load capacity * [t] 8 12.5 50 Max. span * [m] 25 30 35 Max. long-travel speed* [m/min] 40 Max. cross-travel speed* [m/min] 30 25 Max. lifting speed* [m/min] 12.5 Stepless motions 3 axes

ISO – 53.020.20 – Cranes

Cranes — Overhead travelling cranes and portal bridge cranes — Tolerances for cranes and tracks Cranes — Design principles for loads and load combinations — Part 1: General 95.99: Cranes — Bridge and gantry cranes — International Standards for design and manufacturing requirements and recommendations

The design load for the crane system is based on the rated capacity plus 15% for the weight of the hoist and trolley (capacity x 1.15) and an additional 25% for impact (capacity x 1.25) for a total design capacity x 1.4. (Note 25% impact factor is good for hoists speeds up to 50 fpm).

The article describes the basic principles of operation of the Overhead cranes and the design selection criteria for the various components of the overhead crane. The major components of the Overhead crane are: a traveling base with a traveling rail on either side. Imagine the railway tracks; it is quite similar to the same except for the distance.

All new overhead and gantry cranes constructed and installed on or after August 31, 1971, shall meet the design specifications of the American National Standard Safety Code for Overhead and Gantry Cranes, ANSI B30.2.0-1967, which is incorporated by reference as specified in Sec. 1910.6. (3) Modifications. Cranes may be modified and re-rated

Are you planning on purchasing professional overhead travelling crane? Overhead crane capacity is from 1 to 450 ton. Check for details.

IS 3177 (1999): Code of Practice for Electric Overhead

manufacturing and erection of electric overhead travellingcranes, portal-andsemi -portalcranes, single girder, double girder or mono-box type (see Fig. I). It does not cover steel work cranes which arecoveredin IS4137 : 1985and newclassification for the crane as a whole, which has been defined as from No. AI, A2, A8 and crane mechanism has

333923 – Overhead Traveling Crane, Hoist, and Monorail System Manufacturing *Click to View Top Businesses by Revenue for 333923 – Complete Profiles*. This U.S. industry comprises establishments primarily engaged in manufacturing overhead traveling cranes, hoists, and monorail systems.

Name of Standards Organization: Bureau of Indian Standards (BIS) Division Name: Mechanical Engineering Section Name: Cranes, Lifting Chains and Related Equipment (MED 14) Designator of Legally Binding Document: IS 3177 Title of Legally Binding Document: Code of Practice for Electric Overhead Travelling Cranes and Gantry Cranes other than Steel

OSHA 29 CFR Subpart N contains regulations for: overhead and gantry cranes(1910.179), crawler/locomotive and truck cranes (1910.180), and derrick cranes(1910.181) The ANSI/ASME B30 series of standards cover a wide variety of machines used to lift and move loads, which now include storage and retrieval machines, scrap and material handlers

Overhead Crane Safety and Prevention Crane Operators Hoist Operator The employee that uses the hoist to lift, lower, and move a load by means of an overhead crane. Rigger The employee that is responsible for balancing and securing the load to the hook, and will direct the hoist operator during the lift.

FEM Standard Stepless Varaiable Speed VVVF Control

European Standard Single Gider EOT Crane Have Following Advantage: European standard (DIN/FEM) optimized design, light dead weight, small wheel load, small volume. Max. lifting capacity: 20t. Flexible solution for all lifting needs. Excellent driving properties, frequency control of …

management of overhead travelling cranes including Bridge and Gantry Cranes installed in or on Australian Standard AS 2550.1 (2011) Cranes, hoists and winches – Safe use Part 1: General This procedure sets out guidelines for routine lifts with overhead cranes and hoists. If a load does